Events

The New Cost of the Work Payment Applications

Discussion on the new Cost of the Work Payment Applications to be released on June 14th:

G702GMP-2021, Application for Payment for a Cost of the Work Project with a GMP
G702CW-2021, Application for Payment for a Cost of the Work Project without a GMP
G703CW-2021, Continuation Sheet for Cost of the Work Projects

Created to more closely match the payment processes in Cost of the Work agreements such as the A102, A103, A133 and A134, these new forms make it easier for the construction manager or contractor to identify- and for the architect and owner to understand- the cost of the work in-place versus the estimated cost as the work progresses and where costs have shifted from month to month.
 
Walk away with information on when to use the Cost of the Work forms, key distinctions from the traditional G702 and G703, and the implications of a Schedule of Values that changes over time.


Speakers:
Roger Attanasio AIA, CCCA, LEED AP
Principal, Vice President
LS3P
Robin G. Banks, Esq.
Principal
Goldberg & Banks, P.C
Thomas Hysell FAIA, LEED AP BD+C
Principal
Alliiance
Mike Koger AIA, Esq.
Director & Counsel
AIA Contract Documents

When:
Thursday, June 14, 2021, | 3 - 4 ET | Free webinar

Event Date(s):

• Monday, June 14

Event Time: 3 p.m. to 4 p.m.

Event Place: Online Webinar

Register Online

Acoustic and Sound Control Design Solutions

Acoustic and Sound Control Design Solutions

FREE Live Interactive Webcast - Acoustic and Sound Control Design Solutions

Answering Modern Building Envelope Challenges with Georgia-Pacific's John Chamberlin | cA Weekly Podcast Series

In an ever-evolving market, fresh and innovative solutions are ever-more-needed to meet the needs of building projects. From architects to ...

FREE Newsletters


Acoustic and Sound Control Design Solutions

Acoustic and Sound Control Design Solutions

FREE Live Interactive Webcast - Acoustic and Sound Control Design Solutions

WHITE PAPERS


Reducing the Embodied Carbon of Walls in Industrial Buildings

Reducing the Embodied Carbon of Walls in Industrial Buildings

Kingspan partnered with Kieran Timberlake to quantify how Kingspan can reduce embodied carbon in industrial buildings.

Subscribe Now insta face twitter linkedin
Subscribe Now